NORTHEAST INTERCEPTOR SEWER (NEIS)

Description

Contractor

Traylor Shea Frontier Kenny JV

owner

City of Los Angeles, California

Location:

Los Angeles, California

Project description

Approximately 28,000 LF of Pipe in Tunnel. The 8 foot diameter pipe at the NEIS project was backfilled using two (2) workshafts over 100 feet deep and pumped over 10,000 feet from each of these workshafts. The project was completed successfully ahead of schedule with 500 psi cellular concrete comprising of flyash and cement.

site by blu sky