NORTHEAST INTERCEPTOR SEWER (NEIS)
Description
Contractor
Traylor Shea Frontier Kenny JV
owner
City of Los Angeles, California
Location:
Los Angeles, California
Project description
Approximately 28,000 LF of Pipe in Tunnel. The 8 foot diameter pipe at the NEIS project was backfilled using two (2) workshafts over 100 feet deep and pumped over 10,000 feet from each of these workshafts. The project was completed successfully ahead of schedule with 500 psi cellular concrete comprising of flyash and cement.
